Reno Pattaya · New house construction

House construction in Pattaya

Ground-up house construction in Pattaya, with the building scope, specifications and responsibilities agreed before work begins.

Tell us about your land, the home you want to build and your current plans. We can discuss the construction requirements and what information is needed to prepare a quotation.

Define what your house build includes

A construction quotation needs a clear scope. The main building, internal finishes and external works should be identified so you can understand what is included and what requires a separate allowance.

Main building work

Foundations, structure, walls and roofing in accordance with the agreed plans and specifications. Site conditions and engineering requirements need to be reviewed before these elements are priced.

Electrical and plumbing

Discuss lighting, power points, water supply and drainage during planning, including the positions of fixtures and appliances.

Interior finishes

Flooring, painting, ceilings, doors and bathroom finishes, with the selected materials or allowances recorded in the quotation.

Kitchens and external areas

Confirm whether cabinetry, worktops, terraces, driveways, boundary walls and other external works form part of the building scope or are quoted separately.

What to prepare before requesting a quotation

You can contact us at an early stage. Let us know which details are available and which are still being decided.

  • The land location and available site information
  • Architectural drawings and engineering details, if available
  • The approximate house size and number of storeys
  • The rooms, layout and outdoor areas you want
  • Your preferred materials and level of finish
  • Your budget range and preferred starting date
  • The current status of plans and approvals

If drawings or technical details are incomplete, we can discuss what is needed before a detailed construction price can be prepared.

From initial discussion to construction

1. Discuss the project

Share your location, plans, priorities and budget range so we can understand the proposed build.

2. Review the site and documents

Discuss access, available services, site conditions and the drawings and specifications needed for pricing.

3. Agree the construction terms

Confirm the scope, inclusions, exclusions, material allowances, payment stages and proposed schedule in writing.

4. Build and review progress

Agree how progress will be reviewed and how changes will be approved. Any change affecting the price or schedule should be documented before proceeding.

House construction questions

How much does it cost to build a house in Pattaya?

The price depends on the design, floor area, structure, site conditions, materials and work included. A meaningful quotation needs drawings and specifications, with allowances and exclusions clearly stated.

Can I contact you before my plans are finished?

Yes. Send the information you have and explain what is still being decided. We can discuss the construction scope and the information needed for the next stage.

How long will construction take?

The proposed schedule depends on the size and complexity of the house, site preparation, approvals, materials and weather conditions. Timing should be discussed once the project requirements are clear.

Are kitchens and external works included?

They are included only where specified in the agreed scope. Kitchens, appliances, boundary walls, landscaping and other external works should each be identified in the quotation.

How are changes during construction handled?

Requested changes should be described and priced, including any effect on the schedule, before they are approved and carried out.

Can we discuss the build in English or Thai?

Yes. Mark speaks English as his first language and conversational Thai. Jane speaks Thai as her first language and fluent English.

Tell us about the home you want to build

Send your land location, available plans and an outline of your requirements. Include your budget range and preferred timing if known.